Well I've started , going to be an on going project , but plan to have base down by mid/end of June , then main building up and weathered by end July
Got rid of kennel and cleared bushes hedges etc , skip next week for old shed and 60% of contents .
Herf shack dimensions 6m x 3m spilt into three two sections 1.8 x 3 for bikes , mower etc another 1.8 x 3 for a work shop and then 2.4 x 3 for the herf shack , going to have a front porch/ veranda with handrail , better get my rocking chair , I'll keep you all posted of the progress and got to be strong and no cigar buying for a while lol
Got rid of kennel and cleared bushes hedges etc , skip next week for old shed and 60% of contents .
Herf shack dimensions 6m x 3m spilt into three two sections 1.8 x 3 for bikes , mower etc another 1.8 x 3 for a work shop and then 2.4 x 3 for the herf shack , going to have a front porch/ veranda with handrail , better get my rocking chair , I'll keep you all posted of the progress and got to be strong and no cigar buying for a while lol
Comment